This project involved a Groundwater Pumping well in a land reclamation system for Oil and Gas application in Italy. There was a 6-month implementation of this project.
This project involved a Groundwater Pumping well in a land reclamation system for Oil and Gas application in Italy. There was a 6-month implementation of this project.
Requirements of this project included 6 Electrical cabinets for wells management in different locations, each cabinet with 2 CPUs High availability (Not HW redundant) and small I/O count with analog In/Out.
There were important regulatory requirements to be met with this project including Oil & Gas application with Divisions 1 and 2 Hazardous (Classified) Locations.
The project also had 4.0 requirements including the 6 locations to be connected on fibre optic based Ethernet, to each other and to a central management facility with Scada system for data logging and remote Auto/Man operation.
Moreover, the main Well and pumping station had priority over the other 5 stations and must stop all of them in case of high-high water level in its tank.
Each one of the six wells had the following layout:
Upon the customer’s request one of the systems was used to collect all data from each well and make them available to a remote Scada.
The main cabinet had 2 frequency drives to regulate the pump speed either in steps or in frequency using analog outputs and receiving the actual frequency with analog inputs.
Horner Products used included:
Reasons for the choice of HW:
Most valuable features of the Horner Technology included:
For more information, please contact this project’s supporting distributor:
Contact: Enrico Guasco
Tex-El Automazione & Robotica Srl ,
Via Mulini 1,
Candelo (Bi) -13878
Italy.
Mob: +39 393 934 0024
Email: [email protected]